 This week the protective "hallway" came down between the two buildings, we can see much better, more sunshine is let in. This view is towards the old main entrance of the hospital.  The larger opening in the new building is a temporary opening to allow the CT scanner and MRI scanner to go in.  


 This is the view from the main entranced looking South.
Eventually there will a meandering walk way between the two buildings.


This is the view from the extreme edge of the parking lot on the North end of the building.   The blue pickup is parked in the lane that will curve around the building into the top floor entrance of the emergency room.  The lower road where it splits will circle around the new building allowing a complete drive around the entire site once finished.  Those itty bitty trees down there are actually pretty tall, that level has been built up a good 40 feet and the is where the helicopter landing pad will be outlined in white paint.