The white pipe things on the far right side of the picture are indeed large plastic pipes each twenty feet long. They will be drilled into the slopes 40 feet deep.
Then they will be filled with shotcrete or gunite used for swimming pools and this will stabilize the slopes. The shotcrete is resting on
those pallets over there next to the portable biffy.
The orange Hitachi machine continues to spit chunks of dirt into the dump trucks at an amazing rate, there is some nice terracing going on down slope. The weather the last couple of days has been amazingly clear and cold, very crispy here on the Southern Oregon coast, we don't do well in bright sunshine, we get distracted, disoriented and grumpy....must have clouds.